Photos of Our Past Road and Highway Construction Projects

Interstate 5 Delta Fire Emergency Cleanup - Lakehead, CA - California Dept. of Transportation

2018 to 2019

  • Repair Roadway
  • Clear and chip burned trees along the freeway
  • Repair or replace damaged drainage
  • Replace freeway signs
  • Modify drainage to handle fire debris flows

Buchanan Road – Tuolumne, CA – Federal Highway Administration

2017 to 2018

  • 200' Long, 3 Span Bridge Over Tuolumne River With 350' of Drilled Shafts
  • 2.5 Miles Highway Realignment
  • 200,000 Yards Roadway & Rock Excavation
  • 18,000 Square Foot MSE Wall
  • 10,000 Tons HMA

Highway 299 Big French Creek, CA – California Dept. of Transportation

2016 to 2017

  • Emergency 24 Hr/Day, 7 Days/Week Work
  • 1,000,000 Cu Yd Roadway & Slide Excavation
  • 2 D10 & 3 D9 Dozers
  • 50 On-Highway Trucks & 6 Off-Highway Trucks Working Simultaneously
  • Retaining Wall With Rock Catchment
  • Blasting
  • Helicopter Hydroseeding

Highway 299 Buckhorn, CA – California Dept. of Transportation

2015 to 2016

  • 1,330,000 Cu Yd Roadway Excavation
  • 41,300 Tons of Hot Mix Asphalt
  • Retaining Wall
  • Drainage
  • 7 Miles Roadway Realignment

Highway 126 Cuba/LaCueva, NM – Federal Highway Administration

2014 to 2015

  • 136,932 Cu Yd Excavation
  • 12,481 Superpave Pavement
  • Drainage
  • Fence Construction

Theodore Roosevelt National Park, ND – Federal Highway Administration

2012 to 2013

  • Paving

Jemez Springs/Cuba/LaCueva, NM – Federal Highway Administration

2012

  • Rock Excavation
  • Earthwork
  • Paving

Bucks Lake Road, Quincy/Oroville, CA – Federal Highway Administration

2010

  • 33,000 Tons of Hot Mix Asphalt
  • Mechanically Stabilized Earth Wall (MSE)
  • Construct Pre-Cast Pre-Stressed Concrete Bridge
  • 123,000 Square Yards of Continuous Cold-In-Place Recycling
  • 17,000 Cubic Yards of Earthmoving

Sierra Army Depot – US Army

2010 to 2011

  • 75,000 Tons Aggregate Supply
  • Crushing
  • Trucking

Hyampom Road, Hyampom, CA – Federal Highway Administration

2008 to 2010

  • Five Miles Asphalt Paving
  • Mechanically Stabilized Earth Wall
  • Drainage
  • 100,000 Square Yards Rock Excavating
  • Realignment of Roadway

American River Pump Station Project – US Bureau of Reclamation

2004 to 2007

  • Pump Plant Construction
  • Excavate Hardrock Tunnel for Pump Station
  • 1,000,000 Cu Yd Dirt Excavation
  • River Restoration to Original Channel
  • Water Intake Tunnel & Shaft Drilling
  • Blasting
  • Construct New Roadway to Pump Station